Case study · 01

Real-Time Facility Intelligence

A tablet platform that kept several inspectors on one live survey of a large building.

Role
Engineering delivery of the field platform: data capture, synchronized surveys, mapping and reporting.
Stack
iOS tablets, with bi-directional sync to a central data source.
Constraint
Keep every tablet on the same live survey while several people work across a large building.

Prior experience. This project predates Kuneo and reflects work by people behind the company. Reference available on request.

Real-Time Facility Intelligence: project image
Tablet-based field survey platform.

Overview

A tablet platform for teams inspecting the same property at the same time. Operators captured inventories, defects, photos, classifications and geometric markups into one shared survey.

Bi-directional sync kept maps, images and findings current on every tablet. Dashboards turned the collected data into reports teams could act on.

01 · The challenge

Large buildings, several operators and site conditions that change quickly.

Several inspectors, one survey.

Operators worked across the same property and had to stay aligned to one live survey.

Fragmented notes and delayed updates would have weakened the inspection itself.

02 · What was built

A live inspection workflow.

The platform combined mobile data capture, synchronized surveys, visual mapping and reporting.

  • Tablet-based field data collection
  • Inventories and defect marking
  • Geometric annotations and image capture
  • Synchronized maps and classifications
  • Condition scoring and improvement visibility
  • Dashboards over the collected facility data

03 · Technical focus

Bi-directional synchronization with a central data source.

Sync between tablets.

Every operator needed current maps, images, annotations and classifications without slowing down fieldwork.

The sync model kept several users on the same survey while they worked at the same time.

04 · Outcome

What it gave teams.

Teams gained a shared view of the building and a clearer path from inspection to action. No figures are published for this project.